For builders, GCs and installers
ProPunch: Punch list and turnover verification for homes and multi-unit construction.
Walk each home or unit on a phone and say what you see. ProPunch marks every item pass or fail, sends failures back to the crew that owns them, and gives your client one verified record to sign.
Built for repeating floor plans: set a plan up once and every home of that plan starts from the same list.
Example home: Home 214, Plan 3BR-B. As the home is walked, the items are checked. The caulk at the tub surround fails, with two photos, and goes back to the crew. The crew fixes it, it is re-checked, and the home is verified: 56 items passed first time and 1 failed item fixed.
Walk the unit. The checklist fills as you go.
This is a real walkthrough on a real project, recorded on a phone. Here is the whole job, start to finish.
Step 1: Walk the unit and say what you see.
Open the unit on a phone and talk through each room. The phone records the walk.
Step 2: Every item gets a verdict.
Pass or fail, with the video and photos attached. A failed item goes back to the crew that owns it.
Step 3: The client signs one verified record.
The PM reviews the unit, the client checks the proof and signs, and the record is kept.
One record behind every unit you turn over.
Every completed unit gets a Verified Turnover Record: a record in the client portal for sign-off and a client PDF with dated entries from the unit’s timeline. Every project rolls up into one view.
A punch list from the walkthrough.The checklist is built room by room from your own templates and filled in as the unit is walked.How the walkthrough works
Fixes come back with an owner.Crews are assigned to units by trade. A failed item goes to that crew with its photo and stays open until it passes.Installer tracking
Your client signs on the screen.The owner or buyer signs in to their own portal, sees every item with its proof and flags anything that is not right. A client project manager signs on screen.The client portal
96.5%
of checklist items passed PM review on the first attempt, across 105 units reviewed.
1,500+
verified checkpoints on the record at our beta partner.
Measured at one beta partner (N=1 customer), a multifamily specialty contractor, from live production data, 26 Feb to 10 Jul 2026. Not a multi-customer benchmark.
How the first-pass rate is measured
Methodology: first-pass rate is computed from live production data at our beta partner, a multifamily specialty contractor (N=1 customer), over 26 Feb to 10 Jul 2026. Of 1,549 checklist items that received a project-manager review in that window, excluding items stamped for work completed before ProPunch was adopted, items force-passed and items marked not-applicable, 96.5% were approved on the first review with no rejection or rework, measured from each item’s recorded first-decision field. The figures span 105 reviewed units on one active multi-unit project; they reflect a single beta partner, not a multi-customer benchmark.
Turning over homes? ProPunch for buildersInstalling? ProPunch for installers
See it on your own project.
Thirty minutes. We walk a real unit, turn it into a punch list, and show you the record it leaves behind.